OEE
Management
|
|
CMMS
Work Control
|
|
CMMS
PPM Control
|
|
Multiple
departments supported
|
|
Online
work requests supported
|
|
Multiple
PPM job definition
|
|
Parallel
and series cells supported
|
|
Full
maintenance history recording
|
|
Multiple
Equipment/PPM Jobs
|
|
Different
manufacturing rates for same part on different equipment
|
|
Detailed
information on engineering fault types and causes
|
|
PPM
checklists, defining tasks, spares and safety equipment
|
|
Rate-limiting
equipment specified
|
|
History
work orders supported
|
|
PPM
frequencies from 1 wk upwards
|
|
User-defined
reject categories and causes
|
|
Repairer
data held, supporting statistical reporting
|
|
PPM
scheduling by “Start-to-Start” and “Finish-toStart” logic
|
|
Reasons
for slow running supported
|
|
Project
work history supported
|
|
Planned
& actual m’hrs supported
|
|
User-defined
downtime categories
|
|
Maintenance
manhours recorded
|
|
PPM
suppression feature
|
|
Shift-based
reporting
|
|
User-defined
job types
|
|
“One-stroke”
PPM launch system
|
|
Daily,
weekly and monthly performance reports
|
|
User-defined
work priorities
|
|
PPM
history records held and retrieved with other history records
|
|
Daily,
weekly, monthly and loss-based performance charts
|
|
Work
order planning and scheduling supported at a sensible level
|
|
Date
and shift-based PPM work completion reporting
|
|
Strategic
performance reports (OEE, TEEP, AU, OE)
|
|
Work
order “Hold” feature
|
|
PPM
work order “Cancel” and “Hold” features
|
|
Cell
and department level reporting
|
|
Work
schedule can be printed
|
|
Unscheduled
work order feature
|
|
Response
and repair times visibility
|
|
Summary
shift history log
|
|
PPM
work order printing
|
|
Performance
targets supported
|
|
Maintenance
response time reports
|
|
Open
& overdue PPM job reports
|
|
Weight-based
reject reporting supported
|
|
Maintenance
Uptime, MTBD and MTBF reports
|
|
Electronic
and written craftsmen PPM work history recording
|
|
Online
and offline data input
|
|
Full
work order analysis reports for closed jobs
|
|
12
mth projected PPM schedule and manhours report
|
|
Summary
and detail level reporting
|
|
Detailed
work order history details
|
|
Auto-Launch
PPM feature
|
|
Operator
performance reporting
|
|
Work
Order and Equipment labour and cost reporting
|
|
|
|
Optional
downtime input by either time duration or event clock time
|
|
|
|
Maintenance FMEA
|
|
Downtime
& reject cost reporting
|
|
Stores
Management
|
|
No
probability calculations required
|
|
|
|
User-defined
stock categories
|
|
Designed
to be used by technicians as well as by qualified engineers
|
|
Tooling
Management
|
|
Stock
item lead time, cost, stock location and supplier data held
|
|
Equipment
criticality supported
|
|
Entry
of Change-Outs, Moves and Repairs
|
|
Equipment
parts listings supported
|
|
Equipment
Types used to assist speed of data entry
|
|
Linked
to Downtime Data Entry features in OEE section
|
|
Supplier
details & part numbers supported
|
|
User-defined
decision matrix
|
|
Full
audit trail of tooling moves, changes and overhauls
|
|
Simple
purchase, receipts and issue transaction supported
|
|
User-defined
components structure
|
|
Full
audit trail of toolinh history on equipment
|
|
Automatic
re-order requirements flagging
|
|
User-defined
schedule of who will execute FMEA decisions
|
|
In-Service
Tooling listing
|
|
User-defined
cycle count scheduling
|
|
Hidden
failures highlighted
|
|
Available-For-Use
Tooling listing
|
|
Purchase
order print feature
|
|
Audit
trail for downgraded decisions
|
|
Refurbishment
intervals scheduled and reported
|
|
Stock
adjustments supported
|
|
“Design-Out”
decisions supported
|
|
|
|
Summary
and detail stock reports
|
|
Direct
linkage to PPM generation
|
|
Project
Management
|
|
“Parts-Used”
report
|
|
Definition
of shutdown and opportunistic PPMs in FMEA
|
|
Unlimited
number of projects
|
|
Outstanding
purchase order reporting
|
|
Simple
“Copy & Paste” feature to transfer FMEAs to other equipment
|
|
Each
project can have an unlimited number of tasks
|
|
Stock
transaction reports
|
|
“Copy
& Paste” option has inbuilt security and control features
|
|
Tasks
can be imported directly from Microsoft Project
|
|
Equipment
Parts List feature
|
|
“Design-Out”
decisions can be directly transferred to RCE module
|
|
Manual
or automatic launching of tasks to a pre-determined horizon
|
|
|
|
|
|
Tasks
are managed, planned and reported as any other work order
|
|
Root
Cause Elimination
|
|
|
|
Internal
and contract labour reported separately
|
|
Continuous
improvement programme managed directly
|
|
|
|
Stores
and external purchases charged against the project task
|
|
“5-Why’s”
methodology supported
|
|
|
|
Standard
report for Project Task status
|
|
“Champion”
structure supported
|
|
|
|
Overdue
Task Completion Date reporting
|
|
Due-date
management system incorporated
|
|
|
|
Project
and Task cost reporting
|
|
Downtime
and cost improvement definition
|
|
|
|
|
|
Open
and overdue action management
|
|
|
|
|
|
Improvement
costed reports
|
|
|
|
|
|
Overdue
RCE costed reports
|
|
|